The whole journey of a nonconformity, from incoming inspection to customer complaint, in one place: quarantine and disposition, 8D, PFMEA and control plan revision, SPC, measuring equipment, PPAP and audits. The evidence for each step is linked to an IATF 16949 clause.
Opens as the manager of the Quality department in a fictitious automotive supplier factory.
In the demo, every link in this chain is filled with sample records; you can follow it from start to finish.
Incoming inspection queue, nonconformity records and lot quarantine in one section. The disposition is made in Quality; the lot's stock status in Logistics changes automatically.

Customer complaints are recorded with the portal number and charged-back costs; the 8D is run as a team from D0 to D8 and cannot close in D7 until the PFMEA and control plan are updated.

A chain running from the PFMEA row to the control plan row, and from there to the measurement record on the shop floor. When an 8D lesson updates the PFMEA, the linked control plan rows are flagged for revision.

Measurements linked to a control plan row are entered from a tablet or Excel; the X̄-R chart, Cp/Cpk and Pp/Ppk are calculated automatically.

The measuring equipment list is kept with a calibration schedule; the results of GR&R studies are written to the equipment card.

System, VDA 6.3 process, VDA 6.5 product and CQI-23 audits in one annual programme. Findings of a reported audit are opened as shop-floor actions.

PPAP / PPF element tracking, controlled document master list, change records and customer-specific requirements. Only Quality can raise a document revision.

Internal and customer PPM, 8D on-time closure, Cpk, GR&R and cost of poor quality with their targets on one dashboard; Quality TV on the shop-floor screen.

They work the same way in every module; details on their own pages.
Records are kept in tables on the server; the nonconformity, 8D, control plan, measurement, audit and PPAP pages work with a server connection. The incoming inspection queue comes from Logistics goods receipt and the 8D scrap magnitude from Production data; if these modules are not present, the related fields stay empty.
The D3, D5, closing and monitoring deadlines are changed under Complaints and 8D › Settings; the defaults are 1, 10, 60 and 90 days. Customer-specific requirements are also kept in the CSR list with owner and status.
The screen shows the last 90 days of nonconformity, complaint and measurement records, all open 8Ds and this year's audits. Older records are retrieved by date range from each section's Archive page and can be exported to Excel; the retention period is the time the part is active plus the number of years set in Settings.
The whole journey of a nonconformity, from incoming inspection to customer complaint, in one place: quarantine and disposition, 8D, PFMEA and control plan revision, SPC, measuring equipment, PPAP and audits. The evidence for each step is linked to an IATF 16949 clause.
Start the demo →Give feedback