TAKMOSPRODUCTION ERP
Excel templates FREE Try the demo
Home › Modules › Quality › Complaints and 8D
QUALITY · 02 / 08

Complaints and 8D

Record the customer complaint with the portal number, quantity, quantity shipped and charged-back costs; the 8D opens from here in one click. In the 8D, the root cause is sought with two questions: why did it occur, and why did it escape? The 8D cannot move to monitoring or closing until 'PFMEA and control plan updated' is ticked in D7; if the defect recurs during monitoring, the 8D is reopened.

Evidence mapping: IATF 5.1.2IATF 10.2.3IATF 10.2.4IATF 10.2.5IATF 10.2.6
Process

From complaint to lasting prevention

1Complaint recordPortal number, 0 km / field / warranty type, quantity, quantity shipped and costs (sorting, line stoppage, freight).
2Scope and magnitudeChecked quantity, NOK, rate and cost for the last 12 months come automatically from Production scrap records.
3D1–D4Team, problem description, containment; Ishikawa candidates and 5 Whys for the occurrence and escape root causes.
4D5–D6Corrective, preventive and roll-out actions with owner and due date; trials are recorded.
5D7A PFMEA row and control plan row proposal is generated from the root cause; both ticks are mandatory.
6D8Before / after comparison with nonconformities and complaints for the same product and defect code; the monitoring period starts.

For internal defects, Quick analysis can be used: D2, 5 Whys, trials, D5–D6 and D8; customer and supplier 8Ds run as a full 8D.

Screens

Main screens of the section

Customer complaints
02.1Customer complaintsPortal number, complaint type, quantity / shipped, charged-back cost and linked 8D in one row; the 8D opens from here.
8D list
02.28D listOpen, monitored and closed 8Ds; step progress, next due date, overdue actions and 8D statistics.
8D detail
02.38D detailD0–D8 tabs, scope and automatic problem magnitude, quality records; A4 8D form in one click.

Document outputs

8D report

A4 · 2 pages · D0–D8, Ishikawa and 5 Whys, trials, actions, PFMEA / control plan tick, effectiveness and signature fields

Customer complaint

A4 · customer and portal number, product, type, quantity, costs and description

Links to other sections and modules

  • ProductionScope and magnitude come from scrap data; defects above the threshold without an 8D are suggested as candidate 8Ds.
  • 03 Control Plan and FMEAThe D7 proposal arrives in the PFMEA and control plan as a revision.
  • PurchasingThe number of supplier 8Ds goes into the monthly supplier scorecard.
  • Top Management8D on-time closure and repeat defects are published as KPIs.
Related

Guides, templates and features

FAQ

Frequently asked questions

Under what conditions does an 8D close?

Steps D0–D7 must be complete, the root cause must answer both questions (occurrence and escape), and 'PFMEA and control plan updated' must be ticked. If any of these is missing, the server refuses the move to monitoring and closing.

What is the difference between Quick analysis and a full 8D?

Quick analysis is for internal defects only: it consists of description, 5 Whys, trials, action and verification steps, and the occurrence root cause is sufficient. Customer and supplier 8Ds run as a full 8D.

What happens if the defect recurs after the 8D is closed?

A monitored or closed 8D returns to D5 with 'Recurred — reopen', steps D4–D8 are reopened and the recurrence count increases. Repeat defects are counted separately on the KPI dashboard.

Your feedback on this section

Is there a step you find missing? Write anonymously; leave an e-mail if you would like a reply.

Give feedback