Control Plan and FMEA

In the PFMEA, S, O and D are entered for each row; the action priority is calculated as H, M or L using the AIAG-VDA method. Control plan rows are linked to PFMEA rows; the characteristic, CC/SC mark, tolerance, method, sample, frequency and reaction plan are kept here. Product safety and legal characteristics are tracked in a separate list with the responsible product safety representative (PSB).

Evidence mapping: IATF 4.4.1.1IATF 4.4.1.2IATF 6.1.2.1IATF 6.1.2.2IATF 8.6.6
Process

From risk to inspection record

1PFMEAStep, failure, effect, cause, prevention and detection; action priority from S/O/D.
2Control planEach row is linked to a PFMEA row; special characteristic, tolerance, method, frequency, reaction plan.
3ApprovalA plan is kept in draft, approved, under revision or archived status; prototype, pre-launch and production are separate.
4Shop-floor recordFrom the control plan row you go to measurement entry; a nonconforming measurement prompts the reaction plan.
5RevisionThe 8D D7 proposal puts the PFMEA and control plan into revision status, and the rows are flagged.
Screens

Main screens of the section

Control plans
03.1Control plansProduct, phase, revision and status; plans awaiting revision in a separate filter.
PFMEA
03.2PFMEAS/O/D and action priority per row; high-priority rows are shown together with their actions.
Product safety
03.3Product safetySafety and legal characteristics, inspection method, reaction plan, PSB and verification status; escalation events below.

Document outputs

Control plan

A4 · product, phase and revision; step, characteristic, special mark, specification, method, sample / frequency, record, reaction plan; signature fields

PFMEA

A4 · product, process and team; failure, effect, S/O/D, prevention, detection, action priority and action

Links to other sections and modules

  • 02 Complaints and 8DIn D7, a PFMEA and control plan row proposal comes from the root cause.
  • 04 SPC and MeasurementMeasurements are entered against a control plan row; the tolerance is read from the plan.
  • HRThe training status of PSBs is read from the HR training matrix.
Related

Guides, templates and features

FAQ

Frequently asked questions

How is action priority calculated?

H, M or L is derived from the S, O and D values using a simplified version of the AIAG-VDA (2019) table. The RPN product is not used; H rows require an action, M rows a justification or an action.

Why does a control plan show as awaiting revision?

When a control plan proposal is created in the D7 step of an 8D, the plan moves to revision status and the related rows are flagged. These plans are counted on the section home page and in pending tasks.

What is kept in the product safety list?

Characteristic, class (safety / legal), source, inspection method, reaction plan, PSB and verification interval. If the interval is exceeded, the status turns to a warning; escalation events are recorded with customer notification.