TAKMOSPRODUCTION ERP
Excel templates FREE Try the demo
Home › Modules › Maintenance
BKM · Operations

Maintenance Module

Keeps maintenance work in one place, from equipment and mould cards to breakdown work orders, and from planned maintenance to statutory periodic inspections. Production downtime opens a work order, parts are deducted from the Maintenance store, and cost and MTBF / MTTR are calculated automatically.

21pages
6sections
7modules exchanging data
IATF · OHS · VDAevidence mapping

Try the demo

Opens as the manager of the Maintenance department in a fictitious automotive supplier factory.

EY
Erkan YavuzMaintenance Manager · BKM1
Start the demo →No sign-up · a separate demo server for you
Overview

The journey of a breakdown

In the demo, the trail of a line stoppage from the work order to the indicators is visible in the records.

1NotificationA downtime record or tablet notification opens a work orderComes from Production
2AssignmentA technician is assigned and the work is startedThe load is visible in the technician plan
3CompletionFailure code, work performed, parts and labour are enteredParts are deducted from the Maintenance lot in Logistics
4CostParts + labour + external service are calculated on the serverMaintenance hours go to Accounting
5PreventionA temporary fix opens a shop-floor action; a recurring breakdown is reportedGoes to Quality and to Top Management KPIs
01 · Equipment

Equipment

The equipment card is shared across all modules; the Maintenance tab holds criticality, maintenance strategy, operating hours and warranty information.

  • A / B / C criticality and EN 13306 strategy
  • Open work orders and 90-day breakdown count per equipment
  • Plan, statutory inspection and contract in the side panel
  • In-row editing in the criticality and strategy table
Explore section →
IATF 7.1.3IATF 8.5.1.5
Maintenance · Equipment cards
Equipment cards
02 · Work Orders

Work Orders

Work order flow from breakdown report to closure: assignment, start, completion with failure code and parts, and cost calculation on the server.

  • Work order from production downtime or a tablet report
  • ISO 14224 failure code catalogue
  • Technician plan and shift load
  • Part deduction and cost on the server
Explore section →
İSG · LOTO / iş izni
Maintenance · Work orders
Work orders
03 · Planned Maintenance

Planned Maintenance

Calendar- and counter-based maintenance plans, statutory periodic inspections, autonomous maintenance, service contracts and energy meters.

  • A work order every morning for plans that fall due
  • İSG-Kâtip date mandatory for statutory inspections
  • An anomaly in autonomous maintenance opens a work order
  • Warning before contract expiry, targets for energy consumption
Explore section →
IATF 8.5.1.5İSG Ek-IIIVDA 6.3 P6.4ISO 14001 9.1.1
Maintenance · Maintenance calendar
Maintenance calendar
04 · Mould Acceptance and Maintenance

Mould Acceptance and Maintenance

Mould acceptance, series handover, taking into maintenance and end of life run with a signed protocol; wear part life is tracked with the shot counter.

  • Acceptance: Project + Quality + Maintenance signatures
  • Series handover: Maintenance + Production + Quality signatures
  • The mould status changes with the last signature
  • 80% and 100% thresholds for wear parts
Explore section →
IATF 8.5.1.6IATF 8.5.3VDA 6.3 P6.4
Maintenance · Acceptance and handover protocols
Acceptance and handover protocols
05 · Spare Parts

Spare Parts

Spare parts requirement list, lots in the Maintenance store, purchase requests for parts below minimum and predictive measurements.

  • Minimum / maximum, lead time, supplier
  • Stock is summed from Maintenance lots
  • Below minimum → purchase request (ST)
  • An out-of-threshold measurement opens a predictive work order
Explore section →
Maintenance · Requirement list and stock
Requirement list and stock
06 · Reports

Reports

Indicators such as MTBF, MTTR, PM compliance, reactive ratio and statutory compliance; bad actor Pareto, maintenance cost and Maintenance TV.

  • 10 indicators, coloured against target
  • Bad actor Pareto by downtime
  • Parts / labour / external service cost
  • Maintenance TV refreshes every 30 seconds
Explore section →
Maintenance · KPI board
KPI board
Shared features

System features that also work in this module

They work the same way in every module; details on their own pages.

Document outputs

A4 documents produced by the module

Maintenance KPI summaryA4 · indicator, value, target and status table; management review input

Links to other modules

  • ProductionA downtime record in the breakdown branch opens a work order; signs the mould handover protocol
  • QualityNotification of breakdowns recurring 3 times in 90 days; signature on mould protocols
  • LogisticsSpare parts lots under Maintenance ownership; consumption movements are written
  • PurchasingRequest awaiting approval for spare parts below minimum
  • Top ManagementOpen work order, overdue plan and statutory inspection counts and the KPI summary
  • AccountingMaintenance hours as cost allocation key; production quantity for the energy / piece calculation
  • HRNotification of overdue statutory inspections and publication of the statutory inspection calendar

FAQ

How is a breakdown work order opened?

If the downtime record in Production is in the breakdown branch, the work order opens automatically on the server and the maintenance team is notified. It can also be opened from the Breakdown Report page by entering the equipment and symptom.

When is a planned maintenance work order opened?

Every morning at 06:30, the server scans active plans; it opens a work order for a plan whose calendar due date is within the advance-notice days (default 3) and that has no open work order. If you wish, the check can be run immediately from the Maintenance Plans page.

Where is maintenance data stored?

Work order, plan, statutory inspection, handover protocol, spare part and measurement records are kept in tables on the server; equipment and mould cards are shared with all modules. Open work orders always stay in the list and closed ones for 90 days; older ones are retrieved from the Archive by date range.

Which user is used to log in to the demo?

Maintenance Manager Erkan Yavuz (BKM1). This user has the department manager role, sees all Maintenance pages and can give all signatures on handover protocols.

Try the Maintenance module yourself

Keeps maintenance work in one place, from equipment and mould cards to breakdown work orders, and from planned maintenance to statutory periodic inspections. Production downtime opens a work order, parts are deducted from the Maintenance store, and cost and MTBF / MTTR are calculated automatically.

Start the demo →Give feedback