Project Management

Open the project from one of the ready-made stage templates: new mould, full APQP process, engineering change, transfer, variant or assembly line. The risk class determines which ML gates are mandatory. A gate cannot be passed until its checklist is complete and the mandatory deliverables are approved.

Evidence mapping: IATF 8.3.1IATF 8.3.2.1IATF 8.3.4.4IATF 8.3.6IATF 8.5.6VDA 6.3 P2.1VDA 6.3 P2.3VDA 6.3 P2.4VDA MLA ML0–ML7
Process

From Kick-Off to handover to series production

1Project cardProject number, customer, Kick-Off and SOP week; if a template is chosen, its stages are copied and template corrections are applied to linked projects.
2Identity and rolesRisk class A, B or C and project type; project lead, design, quality, production, purchasing, logistics and sales roles.
3Plan and critical pathStage links give the timeline, float and critical path; a baseline is frozen and deviation is tracked.
4Deliverables, PPAP, ECR30 standard APQP deliverables are tracked by phase and ML gate; PPAP by its 18 elements and level, changes recorded as ECR/ECN.
5Maturity gateThe gate cannot be passed until the checklist is complete and mandatory deliverables are approved; the gate decision requires approval permission.
6ClosureThe project is closed with ML7, a closing note is recorded and the project moves to the archive.

Risk class A makes all ML gates mandatory, B makes ML2, ML3, ML5, ML6 and ML7 mandatory, C makes ML3, ML5 and ML7 mandatory.

Screens

Main screens of the section

Projects
02.1ProjectsOn track, at risk and delayed filters; portfolio chart and project cards with time left to SOP, work / time progress and gates.
Timeline
02.2TimelineAll projects on one chart in SOP order; the selected project's Gantt shows completed, running, delayed and critical stages in separate colours.
Maturity gates
02.3Maturity gatesProject × ML0–ML7 matrix; the ring shows checklist completion, red marks an overdue gate. Gates due within 8 weeks are counted separately.
Open points (LOP)
02.4Open points (LOP)Overdue, on-time and closed open points in three columns; distribution by owner and an ageing chart.

Links to other sections and modules

  • 01 Quotation and PricingA won RFQ becomes a project; customer, volume and SOP come from the quotation.
  • Action systemOpen points are opened as shop-floor actions; when the LOP closes, the action closes too.
  • MaintenanceA 'planned' card is opened for the project's moulds and equipment; acceptance takes place in Maintenance.
  • AccountingAt SOP handover the product's quotation cost is passed to Accounting and the costing role is notified.
Related

Guides, templates and features

FAQ

Frequently asked questions

When can a maturity gate be passed?

All checklist items of the gate must be ticked and the mandatory deliverables linked to the gate must be Approved or Not applicable. Until then the button stays disabled; only a user with approval permission makes the gate decision.

Do template changes reach the projects?

In projects linked to a template, template corrections are applied at the same time. In a project opened without a template, stages are managed manually.

Can the project plan be exported to Excel?

Yes. The plan is downloaded as .xlsx from the project card; a file in the same format can be imported again with its stage and load rows.