Home › Modules › Project › Reports
PROJECT · 04 / 04

Reports

The KPI dashboard compares project indicators under six headings with target and previous month; once a month is frozen, records entered later do not change that month's value. The status report is printed for the portfolio or a single project. The audit evidence page maps IATF 16949, VDA 6.3, VDA MLA and APQP clauses to the records in the program.

Evidence mapping: IATF 7.5.3.2.1IATF 8.3.4.1IATF 8.3.4.2IATF 9.3.2.1VDA 6.3 P2.4VDA 6.3 P4.8APQP
Process

From records to management review

1Live calculation24 indicators are calculated monthly from project, open point, deliverable, capacity and quotation records.
2Target and colourTarget and tolerance in Reports › Settings; green on target, amber within tolerance, red off target.
3Month freezeMonth-end values are fixed; recalculation requires a reason and is logged.
4Status reportRAG status, float, milestones and gates, open points, deliverables / PPAP / ECR and the next 4 weeks.
5Audit evidenceEach clause's status is derived from records; notes and reviews are added and the list is printed.
6PublishingThe KPI summary and audit summary go to Top Management.
Screens

Main screens of the section

KPI dashboard
04.1KPI dashboardIndicators in six categories against target and previous month; a 12-month line in each tile, click for numerator / denominator and the monthly table.
Status board
04.2Status boardOne row per project: traffic lights for time, float, gate, LOP, deliverables, PPAP and escalation; the printable report is in the second view.
Audit evidence
04.3Audit evidenceEvidence present / incomplete / missing per standard and the clauses that need attention.

Document outputs

Status report

A4 · portfolio or single project · RAG, Kick-Off → SOP, work / time progress, float, gates, open points, deliverables / PPAP / ECR, next 4 weeks and critical path

KPI summary

A4 · selected month · value, target, previous month, status and reference; trend charts; Project Management / Quality / Management signature fields

Audit evidence

A4 · clause, requirement, expected evidence, place in the program, status, evidence summary and review; program KPIs for the last 12 months

Links to other sections and modules

  • Top ManagementOverdue gates, SOP risk, gate pass rate, overdue open points and team utilisation are published with the KPI summary.
  • 01 Quotation and PricingWin rate, quotation time and distance to target price are calculated from RFQ records.
  • 03 CapacityUtilisation and overloaded person-week indicators come from the weekly load matrix.
Related

Guides, templates and features

FAQ

Frequently asked questions

What changes when a month is frozen?

That month's KPI values are fixed; records entered or corrected later do not change them. Recalculation is open only to the administrator and is saved with a reason.

How are statuses in the audit evidence determined?

Each clause's status is derived automatically from the records in the program: evidence present, incomplete / attention, or missing. As the printout states, this does not replace the auditor's assessment.

How are the colours in the status report assigned?

Delayed: SOP overrun, delayed milestone or gate, overdue open point, red escalation, work 15 or more points behind time, or negative float. At risk: 5–15 points behind, amber escalation, missed due date or delayed deliverable.