Scrap tracking and Pareto analysis: how to monitor scrap rate by line

Hüseyin Şamlı · 2026-11-08 · 7 min read

Scrap rate is the simplest indicator of how much material, labour and machine time a line throws away. Because it is simple, it is also the easiest one to get wrong: the denominator changes, defect codes get mixed up, and the meeting hears "it was 2% last month, 1.6% this month" while nobody knows which defect actually went down. In this guide I explain how to separate scrap, rework and repair, how to calculate the rate with the right denominator, how to build a defect code catalogue and how to turn a Pareto analysis into actions. At the end there is a free Excel template that calculates scrap rate by line, the Pareto chart and the cost of scrap.

Scrap, rework and repair: separate the words first

On the shop floor these three end up in the same box. If you do not separate them, your rate is either inflated or hides the real loss.

The ISO 9000 vocabulary defines these three actions separately, and IATF 16949 has separate clauses for the control of reworked product (8.7.1.4) and repaired product (8.7.1.5). A practical rule: count only discarded parts in the scrap rate and track rework as its own rate and cost. In injection moulding, runners and purge material are material loss by design, not part scrap; track them separately in kg. First-off parts discarded during setup do go into the scrap log, but under their own code such as "Setup scrap", so they do not hide the main defects.

How to calculate scrap rate: percent or ppm?

The basic formulas:

Scrap rate (%) = scrap quantity ÷ total quantity produced (good + scrap) × 100

Scrap ppm = scrap quantity ÷ total quantity produced × 1,000,000

1% scrap equals 10,000 ppm. Internal scrap is usually discussed in percent because values sit between 0.5% and 5%. Ppm is used for very small rates such as defects that reach the customer: customer ppm is the quantity returned or rejected divided by the quantity shipped. Do not mix the two on one chart.

The denominator question

The denominator is where scrap rates most often go wrong. The effect of each option:

DenominatorExample: 30,000 produced, 450 scrapNote
Total produced (good + scrap)1.50%Recommended. The quantity the line actually processed.
Good parts only1.52%Small difference at low rates, larger at high rates.
Planned quantityvariesDo not use; schedule deviations look like scrap.

Whichever you choose, write it into the definition and use the same one on every line. On multi-operation lines, divide the scrap of each operation by that operation's input; if you divide by the output at the end of assembly, the early operations look artificially good.

A quantity-based rate alone can mislead. A clip worth a few cents and an instrument panel worth twenty euros both count as "1 pcs". So alongside the quantity rate, also track scrap by value: cost of scrap ÷ cost value of production.

How to build a defect code catalogue

A Pareto is only as good as its codes. If "Other" makes up a third of the total, the Pareto tells you nothing. For a good catalogue:

Pareto analysis: using 80/20 in practice

A Pareto chart sorts defect codes from largest to smallest and draws the cumulative percentage. The aim is to find the few codes that make up most of the scrap. 80/20 is a tendency, not a law; in real data the first 80% is sometimes 3 codes, sometimes 6. What matters is the order itself.

  1. Fix the period: weekly or monthly, but the same length when you compare.
  2. Sort the codes by quantity and calculate the cumulative percentage.
  3. Take the same Pareto by cost as well. A defect ranked 2nd by quantity can drop to 6th by cost; a cheap but frequent defect needs a different action from an expensive but rare one.
  4. For the top 2–3 codes, build a second-level Pareto: on which line, which part, which mould cavity, which shift does the code concentrate?
  5. After the action, repeat the Pareto over a period of the same length and put before and after side by side.

Stratification: line, shift, part

The overall scrap rate is an average, and averages hide problems. Split the data by:

Cost of poor quality: turn scrap into money

Management meetings talk money, not percentages. When you calculate the cost of scrap, use the cost accumulated up to the point where the part was scrapped: raw material, labour and machine hours. An assembly scrapped at the last operation costs far more than the same part scrapped at the first. For the full cost of poor quality (COPQ), add rework labour, sorting, customer returns, extra freight and expedited shipments to scrap. Show internal failure cost (caught in the plant) and external failure cost (reached the customer) separately.

From Pareto to action: when to open an 8D report

Scrap tracking that is not linked to actions is just an archive. Write simple trigger rules:

The problem description of the 8D comes from the Pareto: which code, which line, how many parts, what cost. Verification of effectiveness is the Pareto again: did the share of the code drop in the period after the action? IATF 16949 asks for this disciplined approach in its problem-solving clause (10.2.3).

The 6 most common mistakes

What auditors ask

  1. Are scrap targets defined per line, and where do they come from?
  2. How is the scrap rate calculated and what is the denominator? Is the definition written down?
  3. Where is the Pareto for the last three months? What actions were taken for the top three defects, and how was effectiveness verified?
  4. Are rework and repair recorded separately, and is there an instruction for them?
  5. How are scrap parts segregated and disposed of?

Free Excel template

The Scrap Tracking and Pareto template I prepared with this guide works with three input sheets: Scrap Log (date, shift, line, part, defect code, quantity), Production (daily quantity produced) and Lists (lines and targets, parts and unit cost, defect codes). The dashboard shows total production, scrap quantity, scrap rate, ppm, cost of scrap, a chart of rate vs target by line, a Pareto chart with cumulative line and the weekly trend. You can set the Pareto measure to quantity or cost, and a line × defect code table gives you stratification out of the box. Sample data is fictitious: 6 lines, 9 parts, 12 defect codes, 8 weeks.

When Excel is not enough

As the number of lines grows and the scrap log gets dozens of rows per shift, two problems appear in Excel: records are entered late, and the Pareto drifts away from the 8D. In the Quality (scrap tracking) section of the TAKMOS Production Module, scrap is recorded at the line with the defect list of the product group; Pareto and cost are calculated immediately, and a nonconforming result is linked to quarantine or an action.

Scrap Tracking and Pareto

Scrap rate, ppm and cost of scrap by line from the scrap log and daily production; defect code Pareto by quantity or cost and weekly trend on the dashboard.