A control plan is the document that states how the risks you found in the PFMEA are checked on the shop floor: at which operation, which characteristic, with which gauge, on how many parts, how often, and who does what when something deviates. The PFMEA asks "what can go wrong?"; the control plan answers "how do we catch it every shift?". In this guide I cover the phases of a control plan, what its columns mean, how to derive it step by step from the PFMEA, how to write a reaction plan that actually works and when the plan must be revised; at the end there is a free Excel template.

What is a control plan for?

A good control plan does three jobs at once. It tells the operator and the quality technician what to do, it shows the auditor that risks are really under control on the floor, and it links the PFMEA with the work instructions. A poor one is just the drawing dimensions copied into a table: "caliper, 5 pcs, 1 per hour" next to every dimension and "inform the team leader" repeated down the reaction plan column.

A control plan is not a work instruction on its own. The check sheet, the SPC chart, the work instruction and the gauge on the floor are all fed by it. If the frequency in the plan differs from the frequency on the check sheet, that is the first nonconformity an auditor finds.

Three phases: prototype, pre-launch, production

IATF 16949 Annex A defines the control plan along three phases of a product's life. For the same part, the control plan changes as the phases progress:

PhasePurposeTypical features
PrototypeVerify the design and first samplesFull layout, lab tests; prepared when the customer requires it
Pre-launchSafeguard the first runs on production equipmentMore frequent checks than in production, extra 100% checks, per-batch measurements
ProductionMonitor product and process characteristics in series productionFrequencies set according to process capability and the PFMEA, clear reaction plans

Extra pre-launch checks should be removed with a documented reason when you move to the production plan. The reason is usually a capability study result or a defined period of defect-free production. The date and basis of that decision should be visible in the revision record.

What do the columns mean?

If your customer does not prescribe a form, you can choose the layout; what matters is that every row carries the information below. In the template we grouped it as "process step – characteristic – how it is checked – what to do on deviation".

InformationWhat to enterCommon mistake
Operation and machine / fixtureSame number as in the process flow and PFMEA; the machine, mould or fixture producing the characteristicOP30 in the flow chart, OP35 in the plan
Characteristic (product / process)A product characteristic is measured on the part (dimension, strength); a process characteristic is set on the machine (temperature, pressure, torque)Listing only product dimensions and forgetting the process
Special characteristicSafety/legal (CC) or significant for function/fit (SC); with the customer's symbolDifferent symbols in PFMEA, drawing and work instruction
Specification / toleranceThe value from the drawing, specification or process sheet"As per drawing" without the value
Measurement / evaluation methodWhich gauge, which fixture, which methodJust "caliper"; a gauge without measurement system analysis
Sample size and frequencyHow many parts per check, how often"Periodic", "as required"
Control methodHow the result is managed: SPC chart, error-proofing (poka-yoke), check sheet, first-part approval, parameter monitoringConfusing the control method with the gauge
Reaction planWho does what on deviation; what happens to suspect parts; when to restart"Inform the team leader"

From PFMEA to control plan, step by step

A control plan is not written on a blank page but from the PFMEA. The prevention and detection controls I describe in how to prepare a PFMEA are its raw material.

  1. Take the operation list from the process flow; keep the numbers identical in all three documents.
  2. For each operation, derive the characteristics from the PFMEA functions and requirements: what is created on the part (product), what must be held on the machine (process)?
  3. Turn every PFMEA detection control into a product characteristic row: method, sample size, frequency.
  4. Write prevention controls (parameter lock, mould maintenance, knife life counter) as process characteristic rows. These are the ones most often forgotten in audits.
  5. Mark the special characteristics; make sure the method is adequate and the frequency is proportionate to the risk.
  6. Write a reaction plan for every row and note the PFMEA row the control is based on.
  7. Read the draft on the floor with the operator and team leader: can the frequency really be followed at this cycle time?

Rule of thumb: a control written in the PFMEA without a matching row in the control plan, or a row in the control plan with no basis in the PFMEA, means one of the two is incomplete.

A reaction plan that works

The reaction plan is the most neglected column of the control plan. A reaction plan that works on the floor answers four questions:

Weak example: "If out of tolerance, inform the team leader." Strong example: "If out of tolerance stop; segregate and 100% measure parts since the last good check; fix the cause and get first-part approval from quality." Automatic checks need a reaction too: after how many consecutive rejects does the machine stop, who holds the key to the reject box, how many retests are allowed?

When is the control plan revised?

IATF 16949 clause 8.5.1.1 requires a control plan and lists the situations that call for a review; Annex A defines the minimum content and the phases. In my own words, review the plan and update it where needed when:

If your customer requires it, submit the revised plan for approval. Record the date, reason, affected operation and approver of every revision; when the auditor asks "did the plan change after the complaint, which row, which revision?", that record is the answer. Always use the current text of the standard and your customer-specific requirements.

Link to layered process audits (LPA)

Is the control plan applied as written? The tool that checks this most often is the layered process audit (LPA): different levels, from team leader to plant manager, check the floor regularly with short question lists. Many automotive customers require LPA as a customer-specific requirement. A good share of LPA questions come straight from the control plan:

A recurring LPA finding may show that a frequency or reaction plan cannot be followed on the floor; that is also a reason to revise.

What do auditors ask?

  1. Does the control plan use the same operation numbers as the PFMEA and the process flow?
  2. Are special characteristics marked with the same symbol in the control plan, PFMEA and work instruction?
  3. Was the plan revised after the last complaint? Where is the revision record?
  4. Is the frequency on the floor check sheet the same as in the plan?
  5. What does the operator do if this characteristic is out of tolerance?
  6. Has a measurement system analysis been done for the measurement method?

The 6 most common mistakes

Ask yourself

If you answer "no" to two of these, the plan may exist on paper but not live on the floor.

Free Excel template

The control plan Excel template comes filled with the same fictitious plastic part line as the PFMEA template: 10 operations, 38 characteristics and 8 revisions. Each row holds operation, phase, machine, characteristic, type, special characteristic, tolerance, measurement method, sample size, frequency, control method, reaction plan, responsible role and PFMEA row; rows missing a method, frequency or reaction plan are flagged automatically. The Revisions sheet keeps the change history and approval status. The dashboard, filterable by operation and phase, shows the number of characteristics, special characteristics, the share with a reaction plan and a measurement method, open revisions and the age of the last revision. Layout and wording are our own; if your customer has its own form, use that.

When Excel is not enough

When the control plan, PFMEA and work instructions sit in separate files, a change in one does not reach the others. In the Control Plan and FMEA section of the TAKMOS Quality Module, control plan rows are linked to PFMEA rows; a complaint or a PFMEA update puts the affected rows into revision.

Control Plan

Product and process characteristics per operation, special characteristics, measurement method, sample size, frequency and reaction plan, with revision tracking. The dashboard shows missing information, special characteristics and revision status.

Download (Excel · 110 KB)
Quality Module · Control Plan and FMEA

See how we do this in the program on the module page, and try it in the demo.

Explore →
More from this area

All guides →