PRODUCTION · 01 / 05

Shop Floor

The Shop Floor section keeps the flow of the shift on the line: the record is opened, plan and actual are entered hour by hour, downtime is coded and andon is called when a problem occurs. At the end of the shift, the handover is locked with the receiver's approval. The weekly shift plan, the mould series fields and Planning's firm plan are also in this section.

Evidence mapping: IATF 8.5.1.3IATF 8.5.1.4IATF 8.5.1.7IATF 8.5.2IATF 10.2.4VDA 6.3 P6.2VDA 6.3 P6.3
Process

From shift start to handover

1Shift recordDate, shift, line and product are selected; planned time, set-up, quantity and rework are entered. If the production lot is empty, one is suggested from the date-shift-product pattern.
2Hourly boardPlan and actual are entered for each hour slot; if actual is below plan, a reason code is mandatory. The total is transferred to the shift record.
3Downtime codingDowntime is coded from the main and sub-reason catalogue; the bucket (planned, set-up, availability, performance) determines its place in OEE.
4AndonThe operator opens a call with line, station and problem type; the responder accepts it and closes it with a resolution note.
5VerificationA checklist is completed for every record with a set-up and for downtime above the threshold; a deviation requires an explanation and an action.
6Shift handoverThe shift summary is prepared automatically; the handing-over person writes open issues and quality and maintenance notes, and the receiver approves.

If a material request is opened with "line down" urgency, a material-type andon opens automatically.

Screens

Main screens of the section

Hourly board
01.1Hourly boardPlan, actual, variance and cumulative per hour slot; reason and action for short hours.
Andon
01.2AndonOpen calls per line, Tier level, response and resolution times; opening an action from a call.
Shift handover
01.3Shift handoverAutomatic shift summary (output, scrap, OEE, downtime) and handover notes approved by the handing-over and receiving persons.
Verification (set-up / downtime)
01.4Verification (set-up / downtime)Pending verifications, verification records and a traceability query by production, input or shipment lot.

Document outputs

Verification Checklist

A4 · items after set-up or downtime, value / note, result; fields for the person completing and approving

Links to other sections and modules

  • MaintenanceDowntime in the breakdown branch opens a Maintenance work order on the server; a maintenance andon is notified to the maintenance team
  • PlanningThe Weekly Plan page shows Planning's firm plan; shift records fill in the actuals
  • HRThe shift plan passes a rule check and goes to HR for approval; leave, night-work and equipment constraints come from HR
  • QualityThe Scrap Tracking record is matched to the shift record; change points await verification evidence
Related

Guides, templates and features

FAQ

Frequently asked questions

Who prepares the shift plan, and who approves it?

The department head or manager prepares the plan in Production. The rule engine checks for employees on leave, those who cannot work nights, equipment constraints, double assignments and inactive employees; if there is a warning, a submission note is mandatory. The plan is published with HR approval.

When is verification required?

Every shift record with a set-up time entered, and any downtime above the threshold or marked as significant, lands in the pending verification list. The record cannot be approved until the mandatory items are answered.

What can Production change on the mould card?

Only the series fields: machine, set-up status, daily check, location and in production / in storage status. The shot counter increases from the shift record; maintenance, revision and scrapped status are set by Maintenance.