TAKMOSPRODUCTION ERP
Excel templates FREE Try the demo
Home › Modules › Production › Production Store
PRODUCTION · 04 / 05

Production Store

The Production Store section records material requests between the line and the main warehouse. When a request is opened, the current balance on the line is visible; the warehouse prepares the request and delivers it in full or in part. Requests that stop the line are reflected as andon on the shop floor and to the relevant team.

Evidence mapping: VDA 6.3 P6.1
Process

From request to line stock

1RequestLine, shift, material and quantity are selected; urgency is marked as normal, urgent or line down.
2NotificationFor a line-down request, a material-type andon call opens automatically.
3PreparationThe main warehouse sets the request to in preparation.
4DeliveryThe delivered quantity is entered; a full or partial delivery is posted to line stock as a receipt.
5MonitoringOpen, line-down and this month's delivered counts; the average delivery time is tracked as a KPI.

The request slip can be printed on A4.

Screens

Main screens of the section

Material request
04.1Material requestOpen, in-preparation and partially delivered requests; urgency and status badges, request slip.
Store home page
04.2Store home pageLatest requests, line materials below minimum and a stock summary by product.

Document outputs

Material Request Slip

A4 · request no., material, requested quantity, urgency, status; field for the preparer (main warehouse)

Links to other sections and modules

  • Shop FloorA line-down request opens a material andon; it appears on the andon board and on the Tier 1 agenda
  • LogisticsMaterial-type andon calls are notified to the logistics team
  • PerformanceThe average delivery time for material requests is tracked on the KPI board
Related

Guides, templates and features

FAQ

Frequently asked questions

Who delivers the request?

Delivery is performed on the material request page by a user with approval permission, i.e. the main warehouse. If the delivered quantity is less than requested, the request stays open as partially delivered.

What does line-down urgency change?

While the request is open, in preparation or partial, a material-type andon call is opened for that line. This keeps the request visible on the shop floor and in meeting agendas.

Your feedback on this section

Is there a step you find missing? Write anonymously; leave an e-mail if you would like a reply.

Give feedback