TAKMOSPRODUCTION ERP
Excel templates FREE Try the demo
Home › Modules › Production › Performance and Meetings
PRODUCTION · 02 / 05

Performance and Meetings

The Performance and Meetings section turns shift, downtime, scrap and andon records from the shop floor into indicators. OEE is broken down into availability, performance and quality; losses are ranked in a Pareto by reason code. Meeting agendas and printed reports are prepared from the same data.

Evidence mapping: IATF 8.5.1.7IATF 9.1.1.1IATF 9.1.1.2IATF 9.1.1.3IATF 9.3.2.1IATF 10.3.1VDA 6.3 P6.3VDA 6.3 P6.5
Process

From record to management review

1MeasurementOEE (capped), FPY, PPM, downtime and set-up ratios are calculated from shift records.
2Tier 110 minutes at shift start: safety, handover notes, hourly deviation, open calls and verifications.
3Asakai (Tier 2)SQDCP summary of the previous shift; OEE, scrap, customer PPM and open actions.
4Tier 330 minutes weekly: OEE trend, the week's loss Pareto, overdue and escalated actions.
5Month endKPIs are recalculated and frozen; the KPI summary and the management review pack are printed.

Actions can be opened directly from off-target KPIs and Pareto rows.

Screens

Main screens of the section

OEE monthly / weekly
02.1OEE monthly / weeklyAvailability, performance and quality breakdown; OEE per line and monthly trend.
KPI board
02.2KPI boardKPIs by category, target and tolerance colours, 12-month trend; month freeze and KPI summary printing.
Tier meetings
02.3Tier meetingsTier 1, Asakai and Tier 3 agendas; full screen and large text in TV mode.
Loss Pareto
02.4Loss ParetoDowntime minutes, frequency and cumulative share by main and sub-reason; action from a row.

Document outputs

Shift Report

A4 landscape · KPIs, line × product, coded downtime, shift handover, open actions

Management Review Pack

2 pages A4 landscape · IATF 9.3.2.1 inputs, results per line, loss Pareto, actions

KPI Summary

A4 · the month's KPIs, target, previous month and status; Production, Quality and Management signature fields

Tier 3 Weekly Summary

A4 · the week's loss Pareto and overdue actions

Audit Evidence

A4 landscape · IATF 16949 / VDA 6.3 clause, expected evidence, its place in the program, status; core KPIs for the last 12 months

Links to other sections and modules

  • Top ManagementOEE, scrap rate, plan attainment, breakdown downtime and open andon are published hourly on the server
  • QualityScrap, FPY and customer PPM come from Scrap Tracking and return records
  • MaintenancePM compliance, MTBF and MTTR are part of the KPI catalogue
Related

Guides, templates and features

FAQ

Frequently asked questions

Which KPIs can be tracked?

The catalogue has 30 KPI definitions, such as OEE and its components, plan attainment, FPY, internal and customer PPM, rework, unlabelled downtime, set-up ratio, andon response and resolution time, action closure, PM compliance, MTBF, MTTR and COPQ / revenue. Which ones are active and their targets are set in Settings.

What is freezing a month for?

The KPI values of a frozen month are fixed and shown in the trend with a lock icon. Corrections entered later do not change the reported value; if necessary, the month is recalculated and frozen again.

How is the bottleneck found?

Takt is calculated as planned time divided by planned quantity. Station cycle times are taken from the station rows in the record, or from the standard cycle if there are none; the highest cycle is marked as the bottleneck and those above takt as warnings.

Your feedback on this section

Is there a step you find missing? Write anonymously; leave an e-mail if you would like a reply.

Give feedback