TOP MANAGEMENT · 05 / 05

Compliance and Risk

Quality, environmental, OHS, supply, infrastructure and information security risks are kept in one register with an impact × likelihood score; each risk's contingency plan is tested within its test interval. The KVKK (Turkish data protection law) data inventory, data subject requests and data breach log are tracked against legal deadlines. The environmental aspect–impact evaluation and the legal register are in the same section; a non-compliant legal register line becomes a management action.

Evidence mapping: IATF 6.1.2IATF 6.1.2.3ISO 14001 6.1ISO 14001 6.1.2ISO 14001 6.1.3ISO 14001 9.1.2ISO 45001 6.1ISO 45001 6.1.3ISO 45001 9.1.2MMOG/LE M1KVKK md.10–13
Process

From risk to management action

1RecordRisk type, scenario, impact and likelihood (1–5), measure and contingency plan are entered; a risk with a score of 15 or more is high.
2TestThe contingency plan is tested within its test interval (default 12 months); risks with an overdue test or no plan have their own filter.
3FindingIf the test calls for action, a management action is opened together with the result.
4Environment and legalA significant environmental aspect is added to the risk register in one click; a legal register line is concluded with Evaluate, and a result of not compliant or partly compliant opens a management action.
5KVKK deadlinesThe 30-day response period for requests and the 72-hour period for notifying the Board of breaches are counted.
6Audit evidenceThe records feed Top Management's clauses in Audit Readiness.
Screens

Main screens of the section

Compliance and Risk home page
05.1Compliance and Risk home pageSix cards: open and high risks, overdue tests, open KVKK requests and days left, open breaches, inventory lines awaiting approval, significant environmental aspects and non-compliant legal requirements.
Risk and contingency register
05.2Risk and contingency registerType, scenario, impact × likelihood, owner, last test and status; a 5 × 5 risk matrix below. Measure, plan and next test date of the selected risk in the side panel.
KVKK requests
05.3KVKK requestsRequest date, the requester's role, request type and time left of the 30 days; the requester's name is not recorded.
Legal register
05.4Legal registerLegislation and article, requirement, area, responsible module, last evaluation and compliance result; lines not evaluated for 12 months are flagged.

Links to other sections and modules

  • HRDetails of OHS risks are in HR › OHS Risk Assessment; the risk register summarises them under the OHS type.
  • 02 Audit ReadinessRisk, KVKK, environmental and legal records make up Top Management's audit evidence clauses.
  • 03 Actions and Approval QueueManagement actions opened from test findings and non-compliant legal register lines are tracked here.
Related

Guides, templates and features

FAQ

Frequently asked questions

When is a contingency plan tested?

Each risk has a test interval (default 12 months). If the interval has passed since the last test, the risk becomes 'Test overdue'; Test done records the date and result and, if needed, opens a management action.

How do I track KVKK deadlines?

For each data subject request the time left of the 30 days is shown in the list; 5 days or less is red. In the breach log the time from detection to notification of the Board is calculated, and notifications later than 72 hours are flagged.

When is an environmental aspect significant?

When the severity × likelihood score is 15 or more, or 8 or more for an aspect with a legal requirement. If a significant aspect has no counterpart in the risk register, it is added as an environmental risk in one click.