TAKMOSPRODUCTION ERP
Excel templates FREE Try the demo
Home › Modules › Maintenance › Reports
MAINTENANCE · 06 / 06

Reports

The KPI board shows maintenance indicators together with their targets; targets are changed in Settings. The reliability page ranks which equipment and failure codes account for the most breakdown downtime. The cost page splits completed work orders into parts, labour and external service; Maintenance TV shows open jobs on the workshop screen.

Process

From data to management review

1RecordWork order, plan, statutory inspection and autonomous maintenance records
2CalculationIndicators from work orders completed in the last 90 days
3ComparisonOn target, near target, off target
4AnalysisBad actors, failure code and component Pareto
5PublicationKPI summary to Top Management; the summary is printed

MTBF: (number of equipment × daily operating hours × 90 − breakdown time) / number of breakdowns; daily hours in Settings.

Screens

Main screens of the section

KPI board
06.1KPI boardMTBF, MTTR, PM compliance, reactive ratio, statutory compliance, backlog, response time, autonomous compliance, breakdown downtime, cost; monthly trends.
Reliability (Pareto)
06.2Reliability (Pareto)Equipment ranking by downtime, cumulative percentage, MTTR / MTBF per equipment and main failure mode.
Maintenance cost
06.3Maintenance costParts, labour and external service totals, monthly stacked chart, cost per equipment and an item list exported to Excel.
Maintenance TV
06.4Maintenance TVOpen work orders, planned maintenance and statutory inspections in three columns; refreshes every 30 seconds.

Document outputs

Maintenance KPI summary

A4 · indicator, value, target and status table; management review input

Links to other sections and modules

  • Top Management"Maintenance KPI summary" publication: indicators, 90-day cost and breakdown downtime
  • BudgetReceiving side of the KPI summary publication; the Department Budget opens with the Maintenance cost center
  • QualityThe recurring breakdown count depends on the Quality notification
Related

Guides, templates and features

FAQ

Frequently asked questions

How is PM compliance calculated?

It is the ratio of active calendar-based plans that are not overdue to all active calendar-based plans. The default target is 90% and can be changed in Settings.

How is Maintenance TV opened?

The Maintenance TV page opens in TV mode and refreshes from the server every 30 seconds; the TV device connects via device login.

Can the cost table be exported?

Yes. The item list on the Maintenance Cost page is downloaded as an Excel file; records retrieved by date range on the archive page are also exported to Excel.

Your feedback on this section

Is there a step you find missing? Write anonymously; leave an e-mail if you would like a reply.

Give feedback