MAINTENANCE · 03 / 06

Planned Maintenance

A maintenance plan is linked to the calendar (days), a counter (hours, shots, cycles, km) or both. Every morning at 06:30, the server opens the work order for plans whose calendar due date is within the advance-notice days and carries the checklist over to the work order. Statutory periodic inspections, operators' autonomous maintenance checks, external service contracts and energy meters are also in this section.

Evidence mapping: IATF 8.5.1.5İSG Ek-IIIVDA 6.3 P6.4ISO 14001 9.1.1
Process

From plan to work order

1Plan set upEquipment or mould, trigger, period, checklist, technician
2Due dateEvery morning at 06:30, the server scans plans that are coming due
3Work orderIf there is no open work order, a new one opens and the maintenance team is notified
4CompletionLast date and next due date are recalculated
5MonitoringPlans, statutory inspections, contracts and work orders together in the calendar

With "Open work order (now)" on the plan, a work order can also be opened without waiting for the due date.

Screens

Main screens of the section

Maintenance calendar
03.1Maintenance calendarPlans, statutory inspections, contract visits and expiries and open work orders in a month grid; overdue items in red.
Maintenance plans
03.2Maintenance plansPeriod, last and next date / counter, technician, estimated duration; checklist and work orders opened from the plan in the side panel.
Statutory periodic inspections
03.3Statutory periodic inspectionsInspection type, period, last and next inspection, inspector, result and findings.
Energy and water meters
03.4Energy and water metersMonthly consumption from meter readings, month-end forecast, variance against target and energy per piece.

Links to other sections and modules

  • 02 Work OrdersA plan that falls due, a statutory inspection and an autonomous maintenance anomaly open a work order
  • HRAn overdue statutory inspection is also notified to the HR role; the calendar is published to HR
  • ActionStatutory inspection findings become shop-floor actions
  • AccountingEnergy cost is divided by the quantity in the production summary
Related

Guides, templates and features

FAQ

Frequently asked questions

What is mandatory when entering a statutory inspection result?

The inspection date, the inspector and the İSG-Kâtip (Turkish OHS registry system) date are mandatory on the server; for inspections that require accreditation, the accredited body is also required. For a conditional or nonconforming result, at least one finding must be entered.

What happens to statutory inspection findings?

Each finding is opened as a shop-floor action (SX) for the Maintenance department; the due date is 3 days for a critical finding and 15 days for others. The next inspection date is calculated as last inspection + period (months).

What does the operator do in autonomous maintenance?

At shift start, the operator ticks the checklist (cleaning, lubrication, tightening, visual check). If an item is not OK or a tag is present, an explanation is mandatory and the server opens a work order: red tag high priority, blue tag normal priority.