Home › Modules › Maintenance › Mould Acceptance and Maintenance
MAINTENANCE · 04 / 06

Mould Acceptance and Maintenance

Every transition in the mould life cycle is made with a handover protocol: acceptance, series handover, taking into maintenance, return to production and end of life. Each role signs only its own signature; this rule is enforced on the server and the mould card status changes with the last signature. Wear part life is tracked against the shot counter.

Evidence mapping: IATF 8.5.1.6IATF 8.5.3VDA 6.3 P6.4
Process

The mould's path from acceptance to end of life

1AcceptanceProject → Maintenance; dimensional report, cooling test, wear part list
2Series handoverMaintenance → Production; try-out approval, set-up instruction, shot-based plan
3Taking into maintenanceProduction → Maintenance; last shot count, damage note
4Return to productionMaintenance work complete, trial shots OK
5End of lifeTotal shot record, scrapping approval; the mould moves to scrapped status

When a protocol type is selected, that type's checklist template is loaded; if an item is not OK, signing requires a confirmation prompt.

Screens

Main screens of the section

Acceptance and handover protocols
04.1Acceptance and handover protocolsType, checklist conformity, signature badges, shot counter and status; who signed when in the side panel.
Wear parts
04.2Wear partsPart life per mould, last replacement, current counter and fill bar; record with "Replaced" and an optional work order.
Mould cards
04.3Mould cardsShared mould card; acceptance date, maintenance period (shots), storage, preservation instruction and customer property information in the Maintenance tab.

Links to other sections and modules

  • ProductionProduction signs the series handover and taking-into-maintenance protocols
  • QualityQuality signature on acceptance and handover protocols
  • ProjectProject signature on the acceptance protocol
  • 03 Planned MaintenanceA shot-based mould maintenance plan is set up with the counter
Related

Guides, templates and features

FAQ

Frequently asked questions

Who can sign?

The Project signature is given by the project role, the Quality signature by quality, the Maintenance signature by maintenance, and the Production signature by the operator, line leader or specialist role; department manager, top management and system can give all signatures. The rule is enforced on the server.

What happens when the protocol is completed?

The mould card status changes by type: in storage on acceptance, in production on series handover and return, in maintenance on taking into maintenance, scrapped at end of life. The shot counter on the protocol is also written to the card.

How is a customer-owned mould tracked?

The asset tag, insurance expiry and damage / loss reports are kept in the Maintenance tab of the mould card. The audit catalogue counts missing identification, expired insurance and unreported damage on customer moulds.

Your feedback on this section

Is there a step you find missing? Write anonymously; leave an e-mail if you would like a reply.

Give feedback