Mould Acceptance and Maintenance
Every transition in the mould life cycle is made with a handover protocol: acceptance, series handover, taking into maintenance, return to production and end of life. Each role signs only its own signature; this rule is enforced on the server and the mould card status changes with the last signature. Wear part life is tracked against the shot counter.
The mould's path from acceptance to end of life
When a protocol type is selected, that type's checklist template is loaded; if an item is not OK, signing requires a confirmation prompt.
Main screens of the section



Links to other sections and modules
- ProductionProduction signs the series handover and taking-into-maintenance protocols
- QualityQuality signature on acceptance and handover protocols
- ProjectProject signature on the acceptance protocol
- 03 Planned MaintenanceA shot-based mould maintenance plan is set up with the counter
Guides, templates and features
Frequently asked questions
Who can sign?
The Project signature is given by the project role, the Quality signature by quality, the Maintenance signature by maintenance, and the Production signature by the operator, line leader or specialist role; department manager, top management and system can give all signatures. The rule is enforced on the server.
What happens when the protocol is completed?
The mould card status changes by type: in storage on acceptance, in production on series handover and return, in maintenance on taking into maintenance, scrapped at end of life. The shot counter on the protocol is also written to the card.
How is a customer-owned mould tracked?
The asset tag, insurance expiry and damage / loss reports are kept in the Maintenance tab of the mould card. The audit catalogue counts missing identification, expired insurance and unreported damage on customer moulds.
Is there a step you find missing? Write anonymously; leave an e-mail if you would like a reply.