MAINTENANCE · 02 / 06

Work Orders

A breakdown is opened as a work order from the downtime record in Production or from the report screen on the tablet, and a notification goes to the maintenance team. A technician is assigned and starts the work; on completion, they enter the work performed, the failure code, the parts used and the labour. Parts used are deducted from the Maintenance store and the cost is calculated on the server.

Evidence mapping: İSG · LOTO / iş izni
Process

From breakdown to closure

1NotificationProduction downtime record or tablet; a work order opens and the maintenance team is notified
2AssignmentA technician is assigned; the load is visible in the technician plan
3StartThe start time is recorded; if waiting for parts, the status is flagged
4CompleteWork performed, failure code, parts, labour, external service
5ClosureCost is calculated, parts are deducted, the plan and equipment card are updated

A job closed with a temporary fix opens a shop-floor action for a permanent fix; if the same failure code recurs 3 times in 90 days on the same equipment, Quality is notified.

Screens

Main screens of the section

Work orders
02.1Work ordersPriority, technician, days since report and status; work performed, failure code, parts and cost in the side panel.
Breakdown report
02.2Breakdown reportLarge-field form for tablets: equipment, symptom, machine stopped or not, safety risk; the latest breakdown reports below.
Technician plan
02.3Technician planUnassigned jobs and each technician's open jobs; load percentage against shift capacity.
Failure code catalogue
02.4Failure code catalogueComponent → failure mode → cause; usage count of each code in the last 90 days.

Links to other sections and modules

  • ProductionA downtime record in the breakdown branch opens the work order on the server
  • LogisticsParts used are deducted from the Maintenance lot and a movement record is written
  • QualityA breakdown recurring 3 times in 90 days is reported to Quality
  • AccountingMaintenance hours from completed work orders are used in cost allocation
Related

Guides, templates and features

FAQ

Frequently asked questions

Who can complete a work order?

On the server, completion and closure are open only to Maintenance, department manager, top management and system roles. A breakdown work order is not accepted without a failure code and the work performed.

How is cost calculated?

Part amounts + labour hours × hourly rate + external service amount. The hourly rate is a system setting; the calculation is done on the server when the work order is completed.

Can two work orders be opened for the same downtime?

No. Once a downtime record is linked to a work order, a second one is not opened; a request arriving at the breakdown report service with the same source number also returns the existing work order's number.