Work Orders
A breakdown is opened as a work order from the downtime record in Production or from the report screen on the tablet, and a notification goes to the maintenance team. A technician is assigned and starts the work; on completion, they enter the work performed, the failure code, the parts used and the labour. Parts used are deducted from the Maintenance store and the cost is calculated on the server.
From breakdown to closure
A job closed with a temporary fix opens a shop-floor action for a permanent fix; if the same failure code recurs 3 times in 90 days on the same equipment, Quality is notified.
Main screens of the section




Links to other sections and modules
- ProductionA downtime record in the breakdown branch opens the work order on the server
- LogisticsParts used are deducted from the Maintenance lot and a movement record is written
- QualityA breakdown recurring 3 times in 90 days is reported to Quality
- AccountingMaintenance hours from completed work orders are used in cost allocation
Guides, templates and features
Frequently asked questions
Who can complete a work order?
On the server, completion and closure are open only to Maintenance, department manager, top management and system roles. A breakdown work order is not accepted without a failure code and the work performed.
How is cost calculated?
Part amounts + labour hours × hourly rate + external service amount. The hourly rate is a system setting; the calculation is done on the server when the work order is completed.
Can two work orders be opened for the same downtime?
No. Once a downtime record is linked to a work order, a second one is not opened; a request arriving at the breakdown report service with the same source number also returns the existing work order's number.