Production Planning

The selected week's jobs are placed into days and shifts as continuous blocks per machine; jobs that exceed the mould change allowance per shift drop into the unplanned list. The calculated plan is written to the server and firmed; Production takes the firm plan to the shop floor, and actual quantities from shift records are written back to the plan.

Evidence mapping: IATF 8.5.1IATF 7.1.3IATF 8.5.1.5VDA 6.3 P6.4
Process

From routing to shop-floor plan

1RoutingOne main routing per product; operation, machine, cycle time, cavities, operators
2AlternativeA draft is opened and the department manager approves it
3PlanThe week is split into day × shift; change limit and operator constraint apply
4Write to serverCalculated plan lines are saved with plan status
5FirmThe firm plan goes to the Production module
6ActualThe Production shift record writes the actual quantity to the plan

A firm plan cannot be written to a machine in maintenance, breakdown or shut down; the server asks for an alternative routing.

Screens

Main screens of the section

Production plan
03.1Production planWeekly total and day / shift breakdown per machine; server plan, firming and achievement rate.
Routings and alternatives
03.2Routings and alternativesMain routing operations, total cycle time, hourly capacity and bottleneck; alternative machines, conditions and approval status.
Machine management
03.3Machine managementMachine list and weekly capacity (hours × days × efficiency), machines out of service, energy consumption and cost.

Document outputs

Shop-Floor Plan

A4 landscape PDF · product totals per machine and day × shift schedule

Links to other sections and modules

  • ProductionThe firm plan goes to the shop floor; the shift record writes the actual quantity
  • MaintenanceMachine status (maintenance / breakdown) comes from the work order and is not changed here
  • ProjectBill of materials (BOM) is read-only from Project
  • 01 Orders and CapacityWeekly load and transfers are inputs to the plan
Related

Guides, templates and features

FAQ

Frequently asked questions

Can Planning change the machine record?

Only the capacity fields: daily hours, shifts, efficiency and number of days. Attempts to change other fields are rejected by the server; the record belongs to Production and Maintenance.

Who approves an alternative routing?

The alternative is opened as a draft; the department manager or top management approves it. The capacity engine uses the approved alternative if the main machine is not running.

Can an operator change the plan?

No. Operators and team leaders can only enter the actual quantity and done status on a plan line; all other fields belong to Planning.