PLANNING · 01 / 05

Orders and Capacity

The order list is imported from Excel or created automatically from the customer's EDI call-off. Each order line is converted into machine hours using the cycle time, cavities and efficiency in the product's main routing; closed days of machines in breakdown or maintenance are deducted from capacity. In an overloaded week, load can be moved to an approved alternative machine.

Evidence mapping: IATF 8.2.1IATF 8.2.3.1.3IATF 8.5.6IATF 9.1.1
Process

From order to capacity decision

1Order entryAn Excel list or an applied EDI call-off opens a new entry; the previous entry is kept
2MatchingThe order code is matched to the product and routing; unmatched codes are listed separately
3Load calculationQuantity ÷ cavities × cycle time ÷ efficiency, plus mould setup time
4DashboardMachine × week utilisation; main machines or transferred plan view
5TransferLoad from an overloaded machine is moved to an alternative and can be undone
6ComparisonThe new entry is compared with the previous one by customer and product

An EDI call-off with changes above tolerance in the firm zone is not applied automatically; it waits for the planner's approval.

Screens

Main screens of the section

Capacity dashboard
01.1Capacity dashboardMachine × week utilisation heat map; main machine, transferred plan and mould transfer plan views, plus a list of load that could not be transferred.
Weekly detail
01.2Weekly detailMachine loads and parts in the selected week; load transfer proposals are applied or undone with one click.
Part / order
01.3Part / orderPart × week order table and a summary of parts with orders.
EDI profiles
01.4EDI profilesPer customer: incoming format, sender ID, firm weeks, tolerance and customer part no. → product mapping.

Document outputs

Capacity Dashboard

A4 landscape PDF · machine × week utilisation table, 16 machines per page

Weekly Detail

A4 landscape PDF · load / capacity per machine, part list, setup and transfer times

Audit Evidence pack

A4 · IATF 16949 / VDA 6.3 clauses, expected evidence, location in the software, status and review

Links to other sections and modules

  • Customer (EDI)DELFOR / DELJIT and VDA 4905 call-offs come in and become orders through part mapping
  • MaintenanceMachine maintenance / breakdown status and dates are deducted from capacity
  • LogisticsOutgoing ASNs (DESADV / VDA 4913) from shipping use the EDI profile
  • 03 Production PlanningRouting and machine capacity fields are inputs to the load calculation
  • Top ManagementCapacity utilisation and late order KPIs are published hourly
Related

Guides, templates and features

FAQ

Frequently asked questions

How is machine load calculated?

Each order line is converted into hours using the cycle time, number of cavities and efficiency in the product's main routing, and mould setup time is added. If the main machine is in maintenance or breakdown, the server engine uses the approved alternative routing.

Does an EDI call-off change the order automatically?

Yes, if automatic application is enabled in the profile, all parts are matched and there is no tolerance breach in the firm zone. Otherwise the message waits for approval; once applied, a new order entry is opened and lines not in the message are kept.

Can you go back to a previous order list?

Each upload is stored as a separate entry. If the active entry is deleted, the data that came with it is removed and the previous entry's list is restored.